The Castle Hotel, Taunton

Estimated savings exceeded

With the installation of a 175kVA powerPerfector unit, energy savings were estimated at 8%, reducing the total electricity consumption in addition to improving power factor and extending the lifespan of hotel equipment.

Read more...

Marston's Inns & Taverns

An engineering solution for a multi-site estate

Why it is interesting: This case study demonstrates how industry-leading engineering can help with the fast, efficient and safe implementation of an energy saving solution. The installation process can determine the success of any energy efficiency project. The powerPerfector solution offers the security of VPO® but also first class engineering and project management.

Read more...

QHotels

Checking in to a more sustainable future

Why it is interesting: Many hotel chains have carbon targets to hit, but consumption is driven by customers, who view a night away as a luxury. VPO® is an energy efficiency technology that requires no behavioural change and delivers carbon savings and an improved bottom line.

Read more...

Handpicked Hotels

Rhinefield house hotel

Why it is interesting: Built in 1887 and set in 40 acres, Rhinefield House in Hampshire, is a 4‐star luxury hotel set deep in the New Forest National Park, among tall conifers and scented pines. It offers 50 bedrooms, an outdoor pool, plus a small indoor leisure facility and pool. With its steeply pitched roof, redbrick chimneys and leaded windows, the design is a blend of Tudor and Gothic, old and new, the romantic and the eccentric. After receiving the annual electricity consumption details for Rhinefield House Hotel, it was possible to give a provisional quote for a powerPerfector unit and to outline the potential for energy savings. A voltage logger was then sent for a little more than a week, which recorded the voltage level at the site. It was found that the average voltage at the site was 243 volts, 13V higher than the nominal supply in the UK.

Annual Savings: kWh: 8.2% | CO2: 63,206kg | £11,287

Hilton Hotels

Hilton Manchester

Why it is interesting: The Hilton Hotel at Manchester Airport features 279 bedrooms, 12 large event rooms, a 20th floor bar, large catering facilities, a fitness suite which contains a fully equipped gym and 20 metre pool. The hotel has a varied load, with televisions, heating, ventilation and air conditioning, and lighting circuits. The hotel is likely to have a high load factor considering the long working hours. Following an evaluation process, a 560kVA powerPerfector unit with an 8% Optimisation was installed. A scheduled shut down of the site was required, with the work carried out over a weekend. Following installation all electrical equipment has operated normally and there have been no reports of any problems. With further observation over time, our clients tell us that equipment life can be noticeably extended.

Annual Savings: kWh: 16.5% | CO2: 105,000kg | £17,220

Savings Reports


• County Hotel

(Download - 720KB)

• Hilton Hotel

(Download - 565KB)

• Celtic Royal Hotel

(Download - 5.8MB)

• Dakota Hotel

(Download - 745KB)

• Down Hall Hotel

(Download - 3.3MB)
 

 

*The greengauge represents the aggregate savings of powerPerfector installations in the UK, Ireland, Cyprus and Denmark. Savings correct at the time of installation using either IPMVP savings analysis or reasonable estimates, where savings analysis was not possible. Actual savings may change over time for example due to energy pricing, occupancy, equipment, rates, building re-purposing and further energy efficiency measures.

All content copyright of powerPerfector Ltd 2015. All rights reserved.